Contacts
26.09.2021
2021 - "Turkmenistan is the Motherland of Peace and Trust"
2021-emblema
Preparation of gas networks for the autumn-winter period is underway in the Dashoguz region
13.09.2021
Preparation of gas networks for the autumn-winter period is underway in the Dashoguz region

At present, one of the main tasks of the gas workers of the «Dashoguzgazupdzhunchilik» management is the timely and high-quality preparation of the region's gas networks for the upcoming winter period.  Preparation of the gas distribution system for operation in the autumn-winter period is the most important element of ensuring their trouble-free operation and uninterrupted gas supply to consumers in the Dashoguz region.

Specialists of the gas business enterprise «Goroglyetrapgaz» service more than 1200 kilometers of gas networks.  A comprehensive survey of more than 450 gas distribution and gas control equipment is being carried out.  In addition to servicing enterprises and organizations, there are about 22 thousand 650 farms on the territory of the etrap.

Qualified specialists of the gas business enterprise «Geroglyetrapgaz», builders and installers of the gasification department of the Dashoguz region of the «Turkmengazupdzhunchilik» management are involved in the work to prepare the networks for the period of maximum loads.

To ensure uninterrupted operation of networks in the city of Gerogly and Geneshlik, specialists have reconstructed a gas pipeline with a diameter of 159 mm.  Also, gas workers continue to install gas meters.
 

Related